Buying an Older Condo in 33483 Delray Beach: Milestone Inspections, SIRS, and Closed Sales

A mid-rise beachside condominium with palm trees and sea grapes beside the ocean under a blue sky.

By Kurt Lehmann, Lehmann Realty Inc

In the Delray Beach city part of ZIP 33483, the beach-side ZIP, most condominium closings under $3 million are in older buildings. Of 188 such closings from October 24, 2025 through October 23, 2026, 172 (91.5%) were in buildings that BeachesMLS lists as built in 1995 or earlier, and 130 of those were in buildings of three or more stories.[6] Buildings of three or more habitable stories are the ones Florida’s milestone-inspection and Structural Integrity Reserve Study (SIRS) rules cover. This page covers what the rules require, what the paperwork shows, how lenders read it, and what the closed sales look like. It covers sales under $3 million, which were 188 of the 192 condominium closings in the window.

The statutes do not rate a building as safe or unsafe. They require inspections and reserve studies, and they require that buyers receive the reports. What a building’s reports say is a fact about that building, to be read from its own documents.[1][2][3]

What 33483 condominium closings under $3 million show

Group (closings under $3M) Closings Median price Median monthly fee Cash purchases Listing flagged special assessment
All condominium closings under $3M 188 $718,750 $1,238 146 (77.7%) 28 (14.9%)
Built 1995 or earlier (all) 172 $711,000 $1,250 135 (78.5%) 27 (15.7%)
Built 1995 or earlier, 3 or more stories 130 $761,250 $1,387 106 (81.5%) 25 (19.2%)
Built 1995 or earlier, 1 to 2 stories 42 $555,000 $944 29 (69.0%) 2 (4.8%)
Built 1996 or later (small sample) 16 $1,167,500 $1,150 11 (68.8%) 1 (6.2%)

Source: BeachesMLS, closed condominium sales October 24, 2025 through October 23, 2026, ZIP 33483, Delray Beach city addresses only, compiled by Lehmann Realty Inc.[6] Year built and stories are listing fields.

This data is not verified for authenticity or accuracy and may not reflect all real estate activity in the market. Based on information © 2026 BeachesMLS, Inc.

  • By MLS year built, 57 of the 188 closings were in buildings built before 1970, 84 in the 1970s, 31 in the 1980s, none from 1990 through 1995, and 16 in 1996 or later. By MLS stories, 145 of the 188 (77.1%) were in buildings of three or more stories.[6]
  • Older buildings of three or more stories had the highest median monthly fee in the table ($1,387) and the highest share of listings flagged with a special assessment (19.2%). The special-assessment flag is a listing field. It shows how often a listing reported one, not the size or purpose of any assessment.[6]
  • More than three-quarters of closings were cash purchases (77.7%). A cash purchase does not go through a lender’s project review. It does not remove the buyer’s own exposure to the building’s finances, covered below.[6][4]
  • The 16 closings in buildings built in 1996 or later are too few to compare reliably. Treat that row as a count, not a benchmark.[6]

Which rules apply to which 33483 building

The milestone inspection statute, s. 553.899, applies to a residential condominium or cooperative building that is three habitable stories or more in height. Under the 30-year schedule, the first inspection is due by December 31 of the year the building reaches 30 years of age, measured from its certificate of occupancy, with transition dates for buildings that reached 30 before December 31, 2024.[1] In practice:

Certificate of occupancy First milestone inspection due (statewide 30-year schedule)
Before July 1, 1992 Before December 31, 2024
July 1, 1992 through 1995 By December 31, 2025
1996 By December 31, 2026
1997 By December 31, 2027

The statute states the transition dates as “before” the listed December 31, so confirm the exact date for a certificate of occupancy near a boundary with the building official.[1]

A local enforcement agency may require the first inspection at 25 years instead, based on local circumstances such as proximity to salt water. The City of Delray Beach and Palm Beach County describe a 25-year trigger for buildings within 3 miles of the coast, which would put many beach-side buildings on an earlier schedule. That is local practice under a discretionary statute, not a statewide 3-mile mandate. Confirm the schedule that applies to the building. The date that matters is the certificate of occupancy, which can differ from the MLS year built.[1]

The SIRS, under s. 718.112(2)(g), is a reserve study of the structural and safety-related components the association must maintain (roof, structure, fireproofing and fire protection, plumbing, electrical, waterproofing and exterior painting, and windows and exterior doors, plus other items over a dollar threshold). It is required at least every 10 years for each building of three habitable stories or higher. For unit-owner-controlled associations that existed on or before July 1, 2022, the general completion date was December 31, 2025, and a SIRS done together with a milestone inspection due on or before December 31, 2026 may not be completed after December 31, 2026. For budgets adopted on or after December 31, 2024, an association required to have a SIRS may not waive SIRS reserves or provide less than the required amount, with narrow exceptions.[2]

One- and two-story older buildings are generally outside both statutes because the triggers are three or more habitable stories. In the table, 42 of the 172 older closings were in buildings of one or two stories by MLS count. Their median fee ($944) and listing-flag share (4.8%) are lower than for the older buildings of three or more stories. The stories field is a listing field, so confirm a building’s height with the building official or the association.[1][6]

Reading the paperwork on an older 33483 condo

  • Milestone inspection summary. After a phase one or phase two inspection, the engineer or architect must submit the sealed report with a separate summary to the association and the building official. Phase two is required if phase one identifies substantial structural deterioration. Within 45 days after receiving the report, the association must distribute the inspector-prepared summary to each unit owner. Repairs for substantial structural deterioration identified in a phase two report must be commenced within 365 days after the local enforcement agency receives the report.[1]
  • SIRS and the budget. Compare the SIRS’s recommended funding schedule with the reserve line in the adopted budget and with the reserve account balance. Funding may come from regular assessments, special assessments, lines of credit, or loans, and any such financing must appear in the annual financial statement provided to prospective purchasers.[2][3]
  • Statutory contract language. For contracts entered into after December 31, 2024, the contract must state whether the association is required to have a milestone inspection or SIRS and whether it has completed one. The buyer is entitled to the milestone summary and SIRS, or a statement that the association has not completed a SIRS, and, depending on the clauses in the contract, may have the 7-day cancellation window described in Can You Cancel a Delray Beach Condo Purchase After Reading the Condo Documents?.[3]
  • Assessments and the estoppel certificate. A unit owner is liable for all assessments that come due while the person is the owner, and is jointly and severally liable with the previous owner for unpaid assessments that came due up to the transfer of title. An installment that comes due after closing is therefore the new owner’s. Whether the seller or the buyer bears a given assessment is a contract term. The estoppel certificate shows the amounts owed on the unit; the association must issue it within 10 business days after a written or electronic request.[4]
  • Board minutes and the DBPR SIRS database. Minutes can show repair bids or assessment discussions before any formal notice. The DBPR SIRS Reporting Database lists only complete, self-reported filings; absence from it is not proof that a study was not done, and presence is not proof that reserves are funded.[2]

How lenders read an older building

A buyer using a mortgage faces a lender’s project review in addition to the documents above. Under the Fannie Mae Selling Guide (B4-2.1-03, version dated November 4, 2026), a condo project in need of critical repairs is ineligible. The guide lists as critical repairs, among other conditions, a project that failed a state, county, or other jurisdictional mandatory inspection or certification specific to structural safety, soundness, and habitability, and unfunded repairs costing more than $10,000 per unit that should be undertaken within the next 12 months, excluding repairs made by the unit owner or repairs funded through a special assessment. A special assessment associated with an unremediated critical repair makes the project ineligible. If a structural or mechanical inspection was completed within 3 years of the lender’s project review, the lender must obtain and review the report.[5]

Fannie Mae also sets reserve rules for condo projects. Under Lender Letter LL-2026-03 (March 18, 2026), for loan applications dated on or after August 3, 2026, a lender that relies on a reserve study must verify that the budget includes the study’s highest recommended reserve allocation, and the baseline funding method is not allowed. For loan applications dated on or after January 4, 2027, the minimum replacement-reserve allocation under the Full Review process rises from 10% to 15% of the annual budgeted assessment income.[5]

The Selling Guide section on ineligible projects does not itself mention milestone inspections or SIRS reports. Fannie Mae’s Project Standards FAQ, however, says a project that has not obtained a required recertification from the local jurisdiction is not eligible until the recertification process is complete. Whether a specific building’s milestone inspection status affects a specific loan is the lender’s determination, so confirm with the lender early. Freddie Mac and other loan programs have their own rules, which this page does not describe. These are Fannie Mae policies as of November 26, 2026 and may change. FHA financing requires the condominium project to be FHA-approved; HUD publishes a lookup.[5]

Where 33483 newer buildings and older buildings differ

Lehmann Florida has building pages for newer 33483 condominiums, including Meridian Delray (built 2005 per county records), Latitude Delray Beach (built 2008), and 236 Fifth Avenue (declaration recorded 2019). Buildings that young have not reached the 30-year point, but SIRS timing runs from the condominium’s creation, so the schedule can differ by building. This page does not state a milestone or SIRS status for any named building. See the condo building index for the full list of building pages, and 33444 vs 33483 for how the two east-side ZIP codes differ.[7]

Jurisdiction matters too. Delray Beach city addresses fall under the City of Delray Beach Building Division. The Town of Gulf Stream is a separate municipality that shares ZIP 33483, so a building there would be expected to answer to that town’s building official rather than Delray Beach’s. See Delray Beach: City or County? for how to check by parcel control number.[7][1]

Quick questions

Is it safe to buy an older condo in 33483 Delray Beach? No statute or listing field answers that for a whole ZIP code. Florida requires milestone inspections and SIRS reserve studies for condominium buildings of three habitable stories or more, and requires that buyers receive the milestone summary and SIRS or a statement that the association has not completed them. The reports for the specific building show what its engineer found and how the association plans to pay for repairs.[1][2][3]

Does every older condo in 33483 need a milestone inspection and SIRS? No. Both apply to buildings of three or more habitable stories. One- and two-story buildings are generally outside the statutes, although the building’s height should be confirmed with the building official or the association.[1][2]

How many 33483 condo closings are in older buildings? From October 24, 2025 through October 23, 2026, 172 of 188 condominium closings under $3 million (91.5%) in the Delray Beach city part of ZIP 33483 were in buildings that BeachesMLS lists as built in 1995 or earlier.[6]

Do cash buyers need to review the building’s milestone and SIRS reports? A cash purchase does not go through a lender’s project review, but the buyer still becomes liable for assessments that come due while the buyer is the owner, and a special assessment can follow a milestone or SIRS finding. The same documents are available to cash buyers.[4][3]

Who pays a special assessment when a condo sells? A unit owner is liable for assessments that come due while the person is the owner and is jointly and severally liable with the previous owner for unpaid assessments that came due before the transfer. Which party pays a particular assessment is a term of the contract. The estoppel certificate shows what is owed on the unit.[4]

Can a buyer cancel after reading the milestone summary or SIRS? For contracts entered into after December 31, 2024, if the association has completed a milestone inspection, turnover inspection report, or SIRS, s. 718.503(2)(e) requires conspicuous contract clauses with 7-day periods (excluding Saturdays, Sundays, and legal holidays) tied to the milestone summary and SIRS: an acknowledgment that the buyer received them more than 7 such days before signing, and a clause making the contract voidable by written notice within 7 such days after signing and receipt. The right ends at closing. How those clauses apply to a particular contract is a question for a Florida real estate attorney.[3]

Next step

Buyers comparing older and newer condominiums in 33483 can start with the Delray Beach 33483 area page, the condo building index, the Condos Under $400K guide, or a custom home search, or call Lehmann Realty Inc at (888) 644-3828 to talk through a specific building’s documents.

This is general market information and general information about Florida law, not legal, engineering, lending, or tax advice, and it is not an appraisal. Milestone-inspection and SIRS requirements are set by Florida law and administered by the local building official and the association. Closed-sale statistics describe past sales and are not a prediction. Confirm the inspector-prepared milestone summary, the most recent SIRS or the statutory statement that one is not required, the financials, and the jurisdiction of the property from the parcel control number, and ask a Florida real estate attorney about the contract clauses that apply to a specific purchase. For a tax question, talk with a qualified tax professional.

Get Lehmann Terms, our free Delray Beach real estate newsletter. Subscribe here.

— K

Kurt Lehmann, Florida Real Estate Broker, BK3176578 / Lehmann Realty Inc, Florida real estate brokerage, CQ1039474 / (888) 644-3828 / 111 SE 2nd Street, Suite 102, Delray Beach, FL 33444 / LehmannFlorida.com / Equal Housing Opportunity.

Sources

  1. s. 553.899, F.S. (2026), subsections (2), (3), (7), (8), and (9), https://www.flsenate.gov/Laws/Statutes/2026/553.899 (text checked November 26, 2026). DBPR, Inspections, https://condos.myfloridalicense.com/inspections/ (accessed November 26, 2026). City of Delray Beach, Milestone Recertification, https://www.delraybeachfl.gov/government/city-departments/development-services/milestone-recertification; Palm Beach County PZB, Mandatory Milestone Inspections, https://discover.pbc.gov/pzb/building/Pages/Mandatory-Milestone-Inspections.aspx (accessed November 12, 2026).
  2. s. 718.112(2)(f) and (g), F.S. (2026), https://www.flsenate.gov/Laws/Statutes/2026/718.112 (checked November 26, 2026). DBPR, SIRS Reporting, https://www2.myfloridalicense.com/condos-timeshares-mobile-homes/condominiums-and-cooperatives-sirs-reporting/. Lehmann Florida, Buying a Delray Condo Under Florida’s Condo Safety Laws.
  3. s. 718.503(2), F.S. (2026), https://www.flsenate.gov/Laws/Statutes/2026/718.503 (checked November 26, 2026). Lehmann Florida, Can You Cancel a Delray Beach Condo Purchase After Reading the Condo Documents?.
  4. s. 718.116(1)(a) and (8), F.S. (2026), https://www.flsenate.gov/Laws/Statutes/2026/718.116 (checked November 26, 2026).
  5. Fannie Mae Selling Guide, B4-2.1-03, Ineligible Projects (11/04/2026), “Projects in Need of Critical Repairs,” https://selling-guide.fanniemae.com/sel/b4-2.1-03/ineligible-projects (accessed November 26, 2026). Fannie Mae, Lender Letter LL-2026-03, Updates to Project Standards & Property Insurance Requirements (March 18, 2026), https://singlefamily.fanniemae.com/media/44986/display ; Fannie Mae, Project Standards Requirements FAQs, https://singlefamily.fanniemae.com/media/5511/display (both accessed November 26, 2026). HUD FHA Condominium Project Approval lookup, https://entp.hud.gov/idapp/html/condlook.cfm. Lehmann Florida, Delray Beach Condos Under $400,000.
  6. BeachesMLS data, closed condominium sales October 24, 2025 through October 23, 2026 (latest close in the export: October 23, 2026), compiled by Lehmann Realty Inc. This data is not verified for authenticity or accuracy and may not reflect all real estate activity in the market. Based on information © 2026 BeachesMLS, Inc. Figures are compiled from BeachesMLS listings of participating brokers, not only listings of Lehmann Realty Inc, and are not a claim of market share. Under $3 million means a closing price below $3,000,000; 4 of 192 closings in the window were at $3 million or more and are excluded. Figures cover ZIP 33483, Delray Beach city addresses only (they exclude the Town of Gulf Stream), condominium property type. “Year built” and “stories” are MLS listing fields and may differ from the certificate of occupancy or the building official’s records. Monthly fee is the listed association fee converted to a monthly amount (quarterly fees divided by three). “Special assessment” is the listing’s yes/no special-assessment field, not a verified assessment record. “Cash” is the MLS buyer-financing field. Medians are of the closings in each group.
  7. Lehmann Florida, 33444 vs 33483: Which Delray Beach Zip Code Is Right for You?; Delray Beach: City or County? Why It Matters When You Buy; building pages: Meridian Delray, Latitude Delray Beach, 236 Fifth Avenue.



Check out this article next

Do You Need HOA or Condo Approval for Impact Windows or a Generator in Delray Beach?

Do You Need HOA or Condo Approval for Impact Windows or a Generator in Delray Beach?

By Kurt Lehmann, Lehmann Realty IncWhether an association must approve impact windows or a generator depends on whether the home is in a homeowners' association…

Read Article
About the Author